本文为南方海洋科学与工程广东省实验室(广州)人才团队引进重大专项(编号GML2019ZD0201)、国家自然科学基金项目(编号4941016,42072240,41830217)、科技部项目(编号2021FY100101,2019QZKK0901),地质调查项目(编号DD20221630)和中国地震局地球物理研究所基本科研业务费项目(编号DQJB20B21)联合资助的成果。
Zheng Yong
1) Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou, Guangdong 511458, China; 2) Key Laboratory of Deep- Earth Dynamics of Ministry of Natural Resources, Institute of Geology, Chinese Academy of Geological Sciences, Beijing 100037, ChinaLi Haibing
1) Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou, Guangdong 511458, China; 2) Key Laboratory of Deep- Earth Dynamics of Ministry of Natural Resources, Institute of Geology, Chinese Academy of Geological Sciences, Beijing 100037, ChinaPan Jiawei
1) Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou, Guangdong 511458, China; 2) Key Laboratory of Deep- Earth Dynamics of Ministry of Natural Resources, Institute of Geology, Chinese Academy of Geological Sciences, Beijing 100037, ChinaYang Shaohua
1) Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou, Guangdong 511458, China; 2) Key Laboratory of Deep- Earth Dynamics of Ministry of Natural Resources, Institute of Geology, Chinese Academy of Geological Sciences, Beijing 100037, China
郑勇,李海兵,潘家伟,杨少华,龚正.2022.长江第一弯虎跳峡的贯通——来自于地表地貌和弹性挠曲的数值模拟分析[J].地质学报,96(8):2942-2954.
Zheng Yong, Li Haibing, Pan Jiawei, Yang Shaohua, Gong Zheng.2022. Connection of the Tiger Leaping Gorge near the First Bend of the Yangtze River: new insights from numerical modelling of geomorphology and elastic flexure deformation[J]. Acta Geologica Sinica,96(8):2942-2954.