A New Method base on Water Drive Curve for Determining the Reasonable Injection-Production Ratio for High Water-Cut Oilfield
DOI:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Reference
Related
Cited by
Get Citation
ZHANG Zhang, QUAN Honghui, XU Zhongbo, HE Xinrong, LI Jun.2015. A New Method base on Water Drive Curve for Determining the Reasonable Injection-Production Ratio for High Water-Cut Oilfield[J]. Acta Geologica Sinica(),89(z1):346